Quantcast
Home / News Stories / $6B power plant proposed for Surry (access required)

$6B power plant proposed for Surry (access required)

NEWPORT NEWS—Old Dominion Electric Cooperative is proposing to build a $6 billion coal- and biomass-fired power plant on 1,600 acres in Surry County. The Glen Allen-based cooperative said Tuesday that it needs a new plant to meet an estimated doubling of energy demand in the next two decades. ODEC generates, buys and transmits power for 12 ...

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

 

Scroll To Top