Contract – Safety Center – Change Orders (access required)

A Loudoun County Circuit Court says a concrete subcontractor on a project to construct the Dulles South Safety Center has not shown by a preponderance of the evidence that defendant contractor owes the sub $950 for demolition of curbs installed by a previous subcontractor, $5,000 for apron slabs not shown on the plans, or $4,000 ...