The case involved the taking of 64,958 square feet of land in fee, and 28,616 square feet of land in a temporary construction easement, from a 4.97 acre parcel owned by Wolf Trap in Vienna. The project included the installation of a power substation and storm water management pond on the property acquired. The commissioner ...